Client : Shell Terminal Lanka (Pvt.) Limited
Main Contractor : Stork Engineers & Contractors B.V. – Netherlands
Project Location : Colombo
Construction Period : Jul-1999 | Dec-1999
Type Of Contract :
- Electrical and Instrumentation Installation.
- Laying of conduits, Cable trey LT cables and Parameter lighting system fire hydrant control system.
- Main power supply from Generator.
- Installation & Commissioning LPG metering package, LPG compress package gas oil dispenser, containerise control room, LPG loading package and weigh bridge, telephone distribution boards.
- Installation of sub-stations, power control panels and Panel connections and cable joints (LT)
- Installation of diesel generator 2 Nos.
- Calibration and install instrument.