Client : PORT OF COLOMBO
Main Contractor : SUMITOMO DENSETSU CO LTD, JAPAN
Project Location : COLOMBO
Construction Period : Jan-1992 | Jul-1993
Type Of Contract :
- Electrical works including laying of conduits and cables.
- Fixing light fittings, installation of main and sub-panels, main feeder cables (up to 240 sq.mm 4 core).
- Installation of Hi-Bay lamps on slip-way roof (at 20 m height)
- Installation of power and control panels for mechanical systems and lighting systems.
- Installation of electrical system for workshop and chemical proof conduit system for battery room.