Client : South Asia Gateway Terminals (Pvt) Ltd
Main Contractor : -
Project Location : Colombo
Construction Period : Dec-2013 | Ongoing
Type Of Contract :
- Remove all networking and power connections.
- Re-install the system in new location.
- Laying of 12 core optical fiber cables and 10MM power cables.
- Connect the optical fiber cables with existing system using fusion splicing.
- Connect the 10MM 3 core power cables and power distribution panels with existing system.